Everything about water system qualification
27. Does the “Nominal Container Volume” as stated in make reference to the volume the container is intended to hold or the quantity it is really filled with?Conditional approval to carry on to the next qualification stage is often specified where by particular acceptance standards or deviation have not been entirely dealt with and there's a doc